Construction estimating & quantity surveying — 220 Collins St, Melbourne VIC 3000
Construction drawings, scale rule and pencil on a drafting table, representing quantity takeoff, bill of quantities and cost estimating for Australian builders
Quantity Takeoffs · Bill of Quantities · Tender Estimating

Construction Estimating Services for Australian Builders You Can Tender On.

Cahill Estimating delivers construction estimating and quantity surveying support for head contractors, builders and subcontractors across every Australian state and territory. We measure your drawings, prepare bills of quantities and price tenders in Australian dollars, to ASMM or your own format, backed by 18+ years of hands-on estimating experience.

18+
Years Experience
24-48h
Turnaround Time
AUD
Priced in Australian Dollars
1
Direct Point of Contact
About The Firm

Outsourced Estimating and Quantity Surveying for Australian Builders.

Cahill Estimating is a construction cost estimating company built on more than 18 years of hands-on estimating experience. We provide quantity takeoff services, cost estimating, bill of quantities and tender preparation for head contractors and subcontractors across Australia, from single-trade measures to full-scope commercial, residential and industrial tenders.

Think of us as an extension of your own estimating office. You send the drawings; we review the scope, measure it, price it against current Australian material and labour rates and return numbers formatted to drop straight into your tender, not a rough figure you have to rework. Quantities can be set out to ASMM, an elemental format or your own bill structure.

  • Estimating team with 18+ years in the trade
  • Serving head contractors & subcontractors across Australia
  • Australian dollar pricing with GST shown separately
  • Every file reviewed by a senior estimator before delivery
  • Engineer certification available for structural drawings
  • Drawings and pricing handled in confidence

Capability Coverage

Quantity TakeoffsCost EstimatesBill of Quantities (BOQ)Tender EstimatingASMM MeasurementCertified Structural DrawingsBuilding Permits & DAsSubcontractor PricingMaterial & Labour RatesQuantity TakeoffsCost EstimatesBill of Quantities (BOQ)Tender EstimatingASMM MeasurementCertified Structural DrawingsBuilding Permits & DAsSubcontractor PricingMaterial & Labour Rates
Core Services

Estimating & Quantity Surveying Services for Australian Tenders

Each estimate is built from your drawings, checked against current Australian material and labour pricing and reviewed by a senior estimator before it reaches you, so you tender with confidence, not guesswork.

Sample Deliverables

Sample Takeoffs, Estimates & Certified Drawings

Every estimate is formatted so it's ready to use, with no reformatting and no chasing down what a line item means. Figures shown are illustrative samples.

QUANTITY TAKEOFF — SHEET 1 OF 3 ITEMQTYUNIT Concrete slab115m² Structural steel16.7tonnes Brick & block walls334m² Roof sheeting910m² Reinforcement5.6tonnes 5 LINE ITEMS VERIFIED CAHILL ESTIMATING

Sample Quantity Takeoff

Line-by-line material quantities pulled directly from the plan set.

COST ESTIMATE SUMMARY TRADELABOURMATERIAL Earthworks & concrete$58,200$84,500 Framing & steel$53,300$103,400 Electrical$29,600$41,000 Plumbing & mechanical$34,400$45,800 Finishes$26,600$38,100 TOTAL (EXCL. GST): $514,900 AUD CAHILL ESTIMATING

Sample Cost Estimate Summary

Labour and material pricing in Australian dollars, rolled up by trade, ready for your tender form.

STRUCTURAL COVER SHEET STRUCTURAL PLAN — LEVEL 1 ENG. CERTIFIED REGISTERED ENGINEER REVIEW CAHILL ESTIMATING

Sample Certified Cover Sheet

Structural drawing set with engineer certification, ready for submission.

Why Contractors Choose Us

Why Australian Builders Outsource Estimating to Cahill

Estimating software gets you a starting number. A second set of experienced eyes is what keeps that number from costing you the tender.

Accuracy you can tender on

Every quantity is cross-checked before it reaches you, so your numbers hold up against a second look.

24–48 hour turnaround

Most takeoffs and cost estimates are delivered within one to two business days of receiving your drawings, with the schedule planned back from your tender close.

Senior estimator review

A senior estimator checks every file before it's sent out, catching what software alone misses.

One point of contact

You work with the same estimator through revisions, questions and any tender-day changes.

Current Australian pricing

Rates are checked against current Australian material and labour data and state and regional factors, so a Perth tender is not priced like a Sydney one.

Confidential handling

Your drawings and pricing stay between your office and ours, start to finish.

Our Departments

The Estimating Teams Behind Your Numbers

Four departments work together on every file, so your estimate is measured, priced, drawn, checked and coordinated by people who know the trades, not just the software.

Cahill Estimating Estimating Department — Australia construction estimating team

Estimating Dept

Quantity Surveying & Pricing

Measures quantities from your drawings and specifications and prices them to current Australian material and labour rates.

Cahill Estimating Architectural Department — Australia construction estimating team

Architectural Dept

Drawings & Documentation

Prepares and coordinates architectural drawings and details so measures and submissions start from clean documents.

Cahill Estimating Engineering Department — Australia construction estimating team

Engineering Dept

Structural Design & Certification

Prepares structural drawings and calculations for review and certification by a registered engineer.

Sample illustration for the Client Services Dept at Cahill Estimating

Client Services Dept

Approvals & Your Point of Contact

Handles intake, building permit and DA packages, revisions and turnaround so you always know who to ask.

How It Works

Drawings in, tender-ready numbers out.

01

Send Drawings

Send your PDF or CAD drawings, specifications and scope notes securely for review.

02

Measure & Price

Quantities are measured in metric and priced in Australian dollars against current material and labour rates.

03

Senior Review

Every estimate is checked by a senior estimator before it's finalised.

04

Delivered to You

Your estimate arrives tender-ready, typically within 24–48 hours.

Trade Coverage

Estimating Across Every Trade on the Job

From residential and commercial work to industrial, education and healthcare projects, with state and regional cost factors, including bushfire and cyclone requirements, built into the numbers.

Earthworks & Siteworks

  • Excavation & bulk earthworks
  • Retaining & site preparation
  • Stormwater & drainage
  • Roads, kerbs & paving

Concrete & Formwork

  • Slabs & footings
  • Suspended & tilt-panel concrete
  • Reinforcement & formwork
  • Retaining walls

Brick & Blocklaying

  • Face brickwork
  • Concrete block & cavity walls
  • Stone & masonry restoration
  • Damp-proof courses

Structural Steel & Carpentry

  • Structural steel fabrication & erection
  • Timber & steel framing
  • Trusses & roof structures
  • Light-gauge steel framing

Roofing & Cladding

  • Metal & tile roofing
  • Roof plumbing, gutters & flashings
  • Facade & cladding systems
  • Insulation & sarking

Windows, Doors & Joinery

  • Windows & external doors
  • Glazing & shopfronts
  • Internal joinery & fit-out
  • Bespoke cabinetry

Plastering, Painting & Finishes

  • Plasterboard & set
  • Painting & coatings
  • Tiling & waterproofing
  • Flooring & ceilings

Electrical

  • Power distribution & switchboards
  • Lighting packages
  • Data & communications
  • Fire detection & alarm

Plumbing & Drainage

  • Hot & cold water services
  • Hot water & gas systems
  • Sewer & stormwater
  • Fixtures & fittings

Mechanical Services & HVAC

  • Ductwork & distribution
  • Air handling & ventilation
  • Air conditioning
  • Building management controls

Fire Services & Life Safety

  • Sprinkler systems
  • Fire hydrants & hose reels
  • Passive fire protection
  • Egress & life safety review

Landscaping & External Works

  • Hard & soft landscaping
  • Fencing & retaining
  • Irrigation
  • Signage & site amenities
Where We Work

Construction Estimating Across Every Australian State and Territory

We price projects nationwide. Approval systems, registration rules and contract practice differ by state and territory, so we set up each estimate for where the job is.

New South Wales & ACT

Residential, commercial and infrastructure tenders, with development approval and construction certificate requirements in mind.

  • Sydney & Western Sydney
  • Newcastle & Hunter
  • Wollongong & Illawarra
  • Canberra & ACT

Victoria & Tasmania

Building permit packages and tenders for builders working across Melbourne, regional Victoria and Tasmania.

  • Melbourne & Greater Melbourne
  • Geelong & Ballarat
  • Bendigo & regional Victoria
  • Hobart & Launceston

Queensland

Estimates that account for cyclonic wind regions, termite management and regional loadings, with RPEQ certification in mind.

  • Brisbane & South East Queensland
  • Gold Coast & Sunshine Coast
  • Townsville & Cairns
  • Toowoomba & Rockhampton

Western Australia

Metro and regional tenders, including remote-area loadings for mining and resources communities.

  • Perth & Fremantle
  • Bunbury & the South West
  • Geraldton & Mid West
  • Pilbara & Kimberley

South Australia

Residential, commercial and industrial takeoffs and tender pricing for Adelaide and regional builders.

  • Adelaide & suburbs
  • Mount Barker & Adelaide Hills
  • Mount Gambier & the South East
  • Whyalla & Port Augusta

Northern Territory & Remote Australia

Remote-area and cyclone-region work priced with separate allowances so the assumptions are visible.

  • Darwin & Palmerston
  • Alice Springs
  • Katherine & the Top End
  • Remote communities
Tools & Platforms

Estimating Software and Tools Your Team Already Uses

Our estimators work across industry-standard takeoff, drawing-review and pricing software, so your files come back in a format your office already knows.

Takeoff Software

Digital takeoffs performed in leading on-screen takeoff platforms such as PlanSwift and STACK.

Plan Review & Markup

PDF and CAD drawing sets reviewed and marked up in Bluebeam Revu for clash checks and scope notes.

Cost & Pricing Data

Labour and material rates checked against current published Australian cost data and state and regional location factors.

Tender & Project Coordination

Deliverables formatted to drop into Procore, Excel, or Google Sheets tender trackers without rework.

Common Questions

Questions Australian Builders Ask About Estimating and Quantity Surveying

How fast can I get an estimate back?

Most standard takeoffs and cost estimates are delivered within 24–48 hours of receiving complete drawings.

What file formats do you accept?

PDF and CAD drawings both work, along with specifications and addenda. Send whatever set you already have on hand.

How much does an outsourced estimate cost?

The fee depends on the size and complexity of the drawing set and the trades involved. Send the drawings and we confirm the scope, turnaround and fee with you before work begins.

Do you measure to ASMM?

We can set out quantities to the Australian Standard Method of Measurement of Building Works (ASMM), to an elemental format, or to your own bill structure. Tell us which you need at the start.

What is the difference between a quantity takeoff and a bill of quantities?

A takeoff is the measurement of items from the drawings. A bill of quantities organises those measured items into sections with descriptions, units and quantities so every tenderer prices the same scope. We can deliver either, or both.

Do you price in Australian dollars, and what about GST?

Yes. Estimates are in Australian dollars and metric. GST is excluded unless you ask otherwise and is noted in the assumptions, so confirm the treatment for your project.

Do you work with subcontractors, or only head contractors?

Both. We estimate for head contractors pricing a full scope and for subcontractors pricing a single trade.

Can you act as our outsourced estimating team?

Yes. Some clients use us for overflow work and others as their whole estimating function. You send the drawings and the tender close date; we measure, price and return a tender-ready estimate.

Can you provide certified structural drawings?

Structural drawings and calculations are prepared for review and certification by an engineer registered or licensed in the relevant state or territory. Registration rules differ by state (Queensland uses RPEQ, for example), and we confirm who certifies before quoting.

Do you cover every state and territory?

Yes, we price projects across Australia. Approval systems differ by state, with a building permit in Victoria and a construction certificate in NSW, for example, so tell us the location and we set the submission accordingly.

Which contracts and tender routes do you work with?

We prepare estimates for tenders under AS 4000, AS 4902, ABIC and state residential contracts, and for public tenders published on AusTender and state tender portals.

How are preliminaries, retention and bank guarantees handled?

Preliminaries, retention, bank guarantees, provisional sums, PC items, contingency, overheads and margin are shown as separate lines or listed as clarifications, so they are visible in your number.

How do you price bushfire, cyclone and remote-area work?

Bushfire attack level (BAL) construction, cyclonic wind regions, termite management and remote-area loadings are priced as separate items or allowances and listed in the assumptions.

How do time zones work for tender closings?

Give us the tender closing time and its state time zone (AEST, ACST or AWST, with daylight saving varying by state) and we plan the schedule back from it.

What if the drawings change after the estimate is delivered?

Send the updated scope and we'll re-price the affected items. You stay with the same estimator throughout.

Get your next tender priced right.

Request a Free Estimate

Send over your plans and scope, and an estimator will follow up — usually within 24–48 hours.

Office: 220 Collins St Melbourne VIC 3000